Constantine Engineering

Our Projects

East and West River WWTP Headworks Modifications, Gadsden, AL

Project Highlights

  • Improved screening and grit removal
  • 15 inch storm drains and catch basins
  • 20 and 36 inch Ductile Iron Pipe
  • On time and under budget

Constantine Constructors was chosen for the Headworks Modifications Project by Cardinal Contractors, Inc., whose southeast office is located in Birmingham, Alabama. The project involved the construction and installation of an improved screening and grit removal system at both the West River and the East River Wastewater Treatment Plants (WWTP). The $237,000 project included a 15" storm drain and catch basin, as well as 30" and 36" Ductile Iron Piping.

Cardinal Contractors, Inc. Birmingham, AL